Kingston Mills Rideau Canal -
Historic Swing Bridge

Problem:
The old electrical control on the swing bridge was unreliable, causing potential boat traffic back-ups in the lock system and road traffic delays.

Solution:
EFP designed, fabricated and installed a state of the art, hydraulic 2 speed rotation system, PLC controlled.

Result:
Happy holiday makers and reduced stress on the Parks Canada staff!

[close window]